Early spring has produced a back and forth of extreme temperature swings. Early March was well above normal with a few days in the 70s. Then by the Ides of March, old man winter returned producing colder temperatures with some overnight lows into the low 20s. The course quickly turned into an emerald green oasis with moderate turf growth in early March, then changed into a tint of brown and little to no growth by the month's end. Currently, it looks like spring has sprung with a beautiful Easter weekend, but after heavy rain and severe storms colder temperatures may make a brief return. Regardless, April is here and the Grounds Crew has begun prepping the course for daily play.
Daily Maintenance
The first mowing of the season took place in late February and early March. The greens came out of the winter in great shape. The low spring time growth rate along with very windy conditions have lead to extremely quick green speeds for the first part of the season. The fairway and tees are recovered from the late February verticutting and some of the dormant seeding is starting to germinate. In addition, mowing of the rough, intermediate rough, flymowing, trimming, changing cups, raking bunkers, and rolling have begun. Daily maintenance will continue to take center stage as the season moves forward.
With the new season always comes new employees to train and we are in the process of training 3 new employees to start off 2024. At the end of February, Kevin Obert (mechanic) moved on to another job opportunity. We thank him for his year of service to WHCC and wish him the best. The Grounds Crew did a decent job filling in and working on the never ending mechanical maintenance until we hired our new mechanic, Corey Cook. Corey has been the lead mechanic at both Traditions Golf Club and Neuman Golf Course in the past and we look forward to his expertise in the coming 2024 season.
Oil change on the driving range cart. Mechanical work is an essential part of keeping the golf course in great shape. |
Mowing #9 green for the first time this year. |
As I wrote about in the November 2023 post, last fall 4 tees were stripped and leveled. During the next four months, whenever the weather cooperated, maintenance was accomplished on these tees to help increase root and shoot growth to try and get them ready for play as soon as possible. We began by heavily topdressing them to smooth out the spaces that occurred when the sod edges were put together, then rolling to smooth out the bumpiness. Fertilization occurred twice in late fall and again in early spring to push growth. As soon as the roots grew to a 3" depth we began aerating and mowing. The tees were opened up for play on Easter weekend and I think they are a big improvement over the previous unlevel surfaces.
Moving forward we will be moving tee markers to spread out wear patterns. This will force shots to be hit from different locations, not just in the same areas in the tee's center. Topdressing will continue during the season to keep filling in bumpy areas caused by the seams from the initial sod installation. In addition, the white tee on #12 was repositioned to aim toward #12 green and not toward #18 green. This along with the leveling should improve tee shots considerably. Keep in mind when filling in divots to only fill them to the soil line and smooth them out with your foot (click here for more information about proper divot repair). One of the reasons the tees become unlevel is because of too much sand placed in divots. Hopefully, we can keep these tees level for many years while we work on leveling other tees this fall.
Aerating #5 tee |
#5 tee open for play. |
Beatification Projects
The Grounds Crew has been busy with the beatification of the grounds this spring. The dying blue spruce tree located by the pool bathrooms has been removed. Also, the false cypress bushes and the saucer magnolia were taken out. A southern magnolia was inserted to replace the blue spruce tree and weigelas sonic bloom pink bushes replaced the old ones. Fire tidbit hydrangeas and artesima filled in the front part of the bed and it will continue to fill in and bloom throughout the season.
The dying taxus bushes behind #2 tee were removed and replaced with emerald green arborvitaes. The size of the landscape bed was shortened and sod was installed on the edges. These will continue to get bigger and block noise coming from #2 tee and #17 green.
The tulips are in full bloom as of this writing. Cooler temperatures will extend the blooms with warmer temperatures decreasing bloom time. On average they usually bloom for about two weeks. The tulips are flowering a week early than normal due to the above average temperatures for winter and early spring. We will see how long they last this year but visit the club soon to experience their spring time show.
Also, some other spring annuals were planted. Pansies and hyacinths, are planted in the back patio pots and window boxes. In addition, the daffodils are blooming throughout the course and clubhouse. Right now WHCC is in full spring time bloom but by the end of April we will be getting the beds ready for the summer annuals.
Area after the blue spruce tree was removed |
Magnolia grandiflora 'Edith Bogue' planted to replace the blue spruce. This particular cultivar is one of the cold hardiest out of all the southern magnolias. |
The area after installation and mulch. Fire tidbit hydrangeas and artesima are in the front with sonic bloom weigelas in the back. |
Area by #2 tee after the old taxus bushes were excavated. |
Emerald Green arborvitaes planted. |
Tulips in full bloom at the new landscape bed installed last fall. |
Tulips blooming in the honor garden. |
Tulips in bloom on Easter evening. |
Miscellaneous Jobs
Every year when the irrigation system gets turned on many leaks begin to materialize. This year was no exception and we have fixed 7 leaks in the last month. Most of these have been pipe issues with leaks at 45° elbows and tee joints. Some of these problems have parts that are on back order. This is the reason why you may notice that some leaks have been roped off until we receive the proper replacement parts to fix them.
The sign boxes at #1 tee and #10 tee were deteriorating and needed to be replaced. Jim Hessel (former mechanic now lead rough mower) agreed to put his woodworking skills to good use and created new boxes for these areas. The new boxes are now installed and should look good for many more years.
Broken pipe by #5 green |
Michael "T" Westendorf taking a nap or fixing an irrigation leak-could be either one after fixing 7 leaks so far this year. |
Jim Hessel drawing the dimensions of the #1 sign box. |
Installation of the new box on #10 tee. |
Finished product. |
This time of year always brings many wind and thunderstorms. Course cleanup (blowing off playing surfaces and picking up debris) is usually a daily occurrence during the spring season and this will proceed as long as mother nature keeps the wind blowing. Our daily maintenance routines will continue to increase as we look forward to calmer, warmer weather for the beginning of the 2024 golf season.
Brad Piecuch