Thursday, March 18, 2021

Spring Projects




After the coldest February in 32 years, the tide has now turned and we are officially into spring. The forecast looks promising for an above average April and hopefully any major cold outbreaks are a thing of the past. The daffodils, tulips and hyacinths are springing up out of the ground and the turfgrass is changing colors from a dull brown to green. The Horticulture team is busy cleaning out landscape beds and adding a fresh layer of mulch before the bulbs begin blooming and-even more evidence that spring is here-the fountain has been cleaned out and turned on for the first time this year. After cleaning, pruning, and mulching around the clubhouse grounds we will start on the beds on the course and begin installing new landscape areas that were approved during the winter.

Tulips emerging

First daffodils starting to bloom

Meanwhile, the Agronomy team is busy finishing up winter projects and beginning spring maintenance. The stump holes, from removed trees over the winter, have been cleaned out and filled with topsoil. We will start seeding some of these areas that are further out in the rough and the holes closer to fairways will be sodded later this month or early April.  Bunker work has been completed and now we are beginning to add sand to bunkers that need it. #17 fairway bunker, #2 green, #9 green, #14 green, #10 green, and #12 green bunkers have all had new drainage added and should drain well this season. Also, the thick February snow pack produced some pink snow mold on a few fairway areas and they should grow out of it once warmer temperatures prevail.

Snow mold on #9 fairway

#12 green bunkers after old sand was removed, drain tile cleaned, and new sand added.

In early March dormant seeding was completed in many rough areas. The abundant amount of trees that call WHCC home thin out many locations from shade and competing roots. This spring we overseeded to fill in these areas with a shade seed mixture. Thin rough spots in sunny locations received a turf-type tall fescue and perennial rye grass mixture.  Over 1,000 lbs of dormant seed were applied to the rough this spring and should help to make a thicker stand once germination begins in April.

Dormant seeding between #13 tee and fairway

Mowing has begun on fairways, tees and greens. The greens came out of the winter looking very healthy and rolling/mowing combined with low clipping yield has produced fast greens to begin the 2021 golf season. The fairways and tees are greening up and the rough will need its first mow around the start of April. The new tee on #13 and the back of #18 have been topdressed and are rooting in well. They should be ready to open up in April.

First green's mowing of the season

Topdressing the new area on the back of #18 tee

This spring, verticutting has been completed on all the fairways. As I have written about in a previous post (click here to read) the fairways have accumulated a decent amount of thatch. Verticutting these fairways will decrease the organic matter at the surface leading to healthier and firmer fairways. In addition, vertical turfgrass growth will encouraged the grass to stand up making for better lies. It will take a few verticutting applications for the thatch to noticeably decrease; however, I am sure in a couple of years it will be much appreciated.

Verticutting #1 fairway

Picking up debris from verticutting with the John Deere TC-125 harvester.


Overseeding of burmuda grass areas that was done last fall looks promising. #11 fairway was overseeded with HGT bluegrass and #15 fairway was overseeded with intermediate ryegrass. So far the ryegrass is the winner, but the bluegrass usually starts out patchy and fills in during the season. The downside with intermediate rye is that it needs to be reseeded every year where the bluegrass does not. We will continue to monitor and come up with a game plan for this fall at a later time.

Dormant Bermuda grass (back right corner on top of hill in this picture) on #15 fairway hillside in 2019

The same area overseeded with intermediate rye in March 2021. We only overseeded the top of the hill and the left side of the hill before the valley for this experiment. We had some skips and should use more seed in the future but the results still look good. 

HGT bluegrass and annual bluegrass filling in Bermuda patch on #11 fairway. Patchy for now, we will see how it progresses.

In the next few weeks, the Grounds Crew will start our greens maintenance program-topdressing, spraying, fertilizing, verticutting along with increasing the daily maintenance jobs. Spring has sprung and we will continue to accomplish tasks that will help the golf course play and look well heading into the summer months. Happy spring!

Brad Piecuch
Grounds Superintendent


Wednesday, February 10, 2021

Old Man Winter's Revenge

 

The Polar Vortex has descended, and set up shop over the Tri-State. After a slightly above normal December and January, February is looking very cold. An overachieving snowstorm on February 9th dropped around 5+ inches of snow, adding to the snow that we received in early February, and there looks to be more on the horizon. Looking back on recent winters, this seems to be one of the coldest we have had in recent memory. Compared to the last two winters where we were mowing greens and fairways in January and February, this year we have not mowed any turf since December 10th.  Also, typically this time of year we have between 20 and 50 GDDs by mid February (Growing Degree Days-used to measure bloom time and insect emergence based on the amount of average 24 hour daytime/nighttime temperatures that are greater than 50 degrees). According to the Ohio State Phenology Calendar, currently we have zero. This is the least GDDs for this area since 2010 when we had 1 by this time. The consistent early winter temperatures (no extreme warm temperatures like highs in the 60s) and the recent cold spell have resulted in 0 GDDs. This is actually a good thing, holding off the blooms of early blooming plants that would be susceptible to hard freezes. On a side note, allowing the fruit trees to slowly wake up from winter's grip and become acclimated will help many of the area fruit growers who lost a large number of their crops, especially peaches, last year due to early flowering and a very late season frost. Hopefully this cold weather will yield to a very normal spring and help many of these plants bloom regularly.

 Luckily, for the Grounds Department, most of the tree work has been accomplished before old man winter blanketed the area. All of the in-house and contracted tree removals have been completed, and all the limb removals have been accomplished. Now the Grounds Department is starting the stump grinding removal process. All the cut trees have stumps that have been ground out and the grindings need to be removed , filled with topsoil, and seed or sod added. This is a long process and takes a couple weeks to accomplish, weather permitting. 


Limbs removed left of #4 fairway

Limbs removed right of #4 fairway to help with chip shots to green

Tree company climbing pin oak tree left of #4 fairway

Finished product left of #4 fairway. Now very open.

Stump grindings of dying cherry tree by #6 cart path

Stump grinding removal

The recent snowfalls have the Grounds team busy with snow removal. The cold snap has left the pavement temperatures below freezing. Any snow that has recently fallen has left the parking lot slippery and snow covered. The Grounds crew has done a fantastic job making sure the lot is clear, staying on call during club hours and plowing as early as 3:00 AM, before patrons arrive. The new snow blower that was purchased last year is finally getting good use.

Michael Westendorf plowing the parking lot in the early morning hours

Chris Wheeler and the new snow blower making quick work of the circle driveway

The Horticulture team is busy drafting landscape designs. One area that will be getting an upgrade is to the right of #12 tee by the entrance. Currently, there are old irrigation pits, a main line water shut off box, and a power meter station in that location, and it could use some sprucing up. There is a big amur honeysuckle bush (an invasive weed) by the main entrance that needs to be removed and replaced with a green giant arborvitae to match the other plant material. The design will include limelight hydrangeas, tiny tuff stuff hydrangeas, feather reed grass, emerald green arborvitaes (for screening of #12 tee), and stewartstonian and fushai azaleas. This should add good color and interest to an otherwise bare area. 

Honeysuckle bush by the entrance will be replaced with a green giant arborvitae to match the ones behind it. The water valve box will be hidden by limelight hydrangeas.

Design for the right of #12 tee/entrance

Next landscape design area to include #5 yardage marker.


Soon old man winter and his polar vortex will be a distant memory and we will be busy with spring-time maintenance once again. Until then, the Grounds team will continue to tackle the important winter projects and we look forward to having a great 2021 season.

Brad Piecuch

Grounds Superintendent

Monday, December 21, 2020

Around the Grounds-Winter

 


Winter projects are in full swing on the Grounds Department. One such project is winter equipment maintenance. It is an annual occurrence that takes place after the mowing has ceased for the season. All the mowers have to be torn down and rebuilt to achieve good mowing results for next season. There is a different degree of maintenance required for different units depending upon their usage. Some of this maintenance includes:

  • The grinding/sharpening of all the walking and riding reel mowers
  • Rebuilding the bearings and seals of all the reel mowers.
  • Grinding of bednives to aid in the reel-to-bednife relationship to achieve optimal mowing results
  • Pressure washing of all the grounds equipment
  • Greasing the mowers
  • Oil changes on the riding equipment
All of this winter mechanical maintenance takes the majority of the winter months to accomplish and is a crucial part in maintaining a quality golf course.

Walking greens mower on the Accu-Pro grinding machine

Another off-season project is drainage work. We are replacing clogged drain tile in some bunkers that have had issues with holding water. Drain tile is being added to other wet areas around the course as well.


New drain tile in #2 bunker

Cleaning off old drain tile


Adding drain tile behind #13 alternate tee




Landscape timbers have replaced the metal edging that framed the #13 bathroom area. The old edging was falling apart and the new timbers will be a nice replacement.


 With the abundant amount of trees that grow in the WHCC urban forest, winter tree work is always a big project. In October, a tree evaluation was accomplished and there are many dead/diseased trees that are going to be cut down. The majority of these trees are the blue spruce trees that have succumbed to rhizosphaera needle cast disease. Other trees are being cut down because of damage from the emerald ash borer, diplodia tip blight, amarilla root rot, pythium root rot, and other biotic stressors. There are a few trees, and many limbs, being eradicated because of their negative impact on play.

Blue spruce trees removed

Silver maple hanging over in between the tee and fairway on #2


Dead sugar maple removed #17 area



The Ohio champion overcup oak tree adjacent to the beginning of #1 fairway is getting some needed attention this season. In late fall, Gregory Forrest Lester Inc, applied fertilizer- both a liquid root feeding of macro-nutrients and a trunk injection of micro-nutrients- helping to give the tree some supplemental food that it normally doesn't receive. They even made a video, taken here at WHCC while doing this procedure. (click here for the link to the video). Other procedures for the tree will include removal of limbs encroaching into the canopy from the neighboring pin oak and silver maple and cutting out dead wood.

Micro-nutrients injected into the overcup oak

In mid-January Wherekamp Enterprises root pruned many fairway areas that were lined with pin oak trees. An Imats root pruner was used on the back of a tractor to sever roots up to 7" deep. Most feeder roots, which are the tree roots that take in the most moisture and nutrients, are in the top 6" of the soil profile so doing this procedure should help the bentgrass fairways receive more water during the hot summer months.



As we enter the winter season I think it is important to touch upon winter closures and course conditions. There are five main reasons why the course may be closed or delayed during winter months.  They are snow, frost, frozen ground, thawing ground, and very wet conditions. The first is fairly obvious, finding a white, or even colored golf ball, after a snow storm is virtually impossible and trying to putt would be comical. Snow does provide insulation from low temperatures and winter winds; however melting snow can refreeze and cause crown hydration injury. Frost and frozen ground can cause significant damage to the turf when walked or driven on. Thawing ground can cause root damage from foot traffic when the top layer of soil is thawed and the lower layer is still frozen. Any traffic during this scenario will break/shear the roots in between the two layers and footprints will be visible for months before they heal. Wet ground is also very common this time of year from the freezing, thawing, heavy rainfall, low evapotranspiration rates, and the dormancy of the turf (prohibiting any water uptake). Walking on highly saturated soil will cause deep footprints that will create craters and unevenness especially prevalent on putting greens. The golf course will have to be closed at times during the winter to prevent negative turfgrass damage. For more information on winter play closures click on this informative article by the USGA.  or this USGA video or this USGA video on root shearing.












As the winter progresses the Grounds Department will continue to work on tree work along with designing new landscape beds located on the golf course, increasing horticulture and turfgrass knowledge by attending online seminars, next season staff recruitment, and the painting and maintenance of some golf course accessories.

Brad Piecuch
Grounds Superintendent
 





Saturday, November 21, 2020

Thanksgiving Grounds Update

 

A November morning sunrise

This is Thanksgiving week and it is the time of year to reflect on what we are thankful for. Personally, I am thankful for my wife (who contrary to popular belief, and at the relief of her college English professor, does not write these posts or articles), for working in an industry that I truly enjoy, for working with a very talented group of individuals, for not having a November ice storm like two years ago, and most importantly for almost being done with the 2020 year. 

I don't have to remind anyone of how much of a circus this year has been, and working on the Grounds Crew has been no exception. This year has transitioned from wondering if we would be able to work; having budget and project cuts; masking up and sanitizing every touchable surface; progressing the putting green cups from raised, to noodles, to cut pvc pipe; having bunker rakes to not having rakes, to having rakes again; and having modified sand divot buckets (or not having I lost count). We all will be thankful to have this virus in the rear view mirror. Hopefully, after a couple more months, we will be seeing an end in sight. Despite all the distractions the agronomy team has been moving forward and completing many maintenance and grounds projects.

The aeration and overseeding of the turf surfaces has been completed, with the play rough finished in the middle of October.  Also, the late fall fertilization of the putting greens, fairways and play rough is completed.

Chris Wheeler aerating #18 rough


The leaf cleanup operation is winding down with around 90% of the leaves fallen. The trees put on a good fall show this year with many vibrant colors exploding because of the favorable temperatures and timely rainfall. At times the leaves were falling faster than our cleanup efforts, due to the recent windstorms combined with the abundant amount of pin oaks loosing their leaves. However, it looks like we are over the hump and can now start to focus our attention on other tasks.

Nyssa sylvatica tree in full fall color

White ash by #3 tee beginning to show fall color

Ginko biloba tree fall color

Black Gum tree for Mr. and Mrs. Thomas' anniversary that was planted in between #8 and #9

Green ash trees on #9 fairway showing good fall color

Honey locust and white ash

White ash fall color

The Horticulture Team has been hard at work removing the summer annuals and prepping the landscape beds for the winter by cutting down grasses, perennials, and cleaning out debris. Also, they have planted 5,000 tulip bulbs and some daffodils for the upcoming spring season.

Megan Bihl and Carole Snap planting 1,200 tulips around the red oak tree. Great Job!

Bunker drainage work has begun. There are some bunkers that are holding water after rainstorms and we are replacing and adding drain tile in those sand traps for better drainage. #17 fairway bunker and #10 green side bunker have been completed. Also, we will begin to work on adding drainage in some wet areas around the course and improving other bunkers as time allows.

Raymond, Julio, Wilfredo, and Miguel working on bunker drainage. Their awesome work ethic and reliability help keep this course in great shape. Their importance to this crew can not be overstated.

Michael Westendorf working the mini backhoe.

We continue to add turf-lock blocks to wet areas adjacent to cart paths. #11 tee area is the latest wet area where these blocks have been added. We will continue to add turf-lock blocks as the winter progresses.


Tee leveling of #18 tee and the expansion of #13 alternate tee is completed. With the help of Russ Macke, the old sod was excavated, tees reshaped, and new sod placed on. #13 alternate tee is now double the size of the old tee and the back of 18 championship tee is level.

Bentgrass sod stripped on #13 tee.


Excavating sod on #13 tee

Sod stripped to allow for expanding the tee and surrounds

Starting to strip the back of #18 tee

25 loads of soil removed from back half of tee. That soil was used to construct #13 tee.

Reshaping tee

Tee leveled, ready for bentgrass sod


Laying new bentgrass sod on expanded #13 tee

#13 tee completed

Back of #18 tee leveled

Back of the tee will be closed until spring to let the sod heal in.

The Agronomy Team has been experimenting with intermediate ryegrass for overseeding. The overseeding of Bermuda grass in the #3  rough between the creek and green seems to have germinated well. We will continue to monitor and perhaps expand the overseeding next season.


#3 Bermuda grass in mid October 2018

#3 Bermuda grass in mid October 2020 after overseeding with ryegrass, the Bermuda is not as detectable. Notice the right side that was not overseeded compared to the middle that was. Looks promising

The winter tree work is in the process of being approved. There are some trees that need to be removed because of damage or disease. One example is the pin oak adjacent to #5 tee. It is infected with armillaria root rot (honey fungus) which is a devastating fungal disease that rots heartwood, decreasing the structure integrity of the tree. This tree is recommended for immediate removal. Also, there are many limbs that are affecting play that will be pruned out this winter. We will be beginning tree work during the winter months.

Armillaria (honey fungus) infecting the pin oak tree by #5 tee. The severe fungal infection extends five feet up the trunk.


On behalf of the Grounds Department, I want to wish everyone a happy and healthy Thanksgiving!


Brad Piecuch

Grounds Superintendent